(UTV|COLOMBO) – India is set to re-attempt the launch of its second lunar mission a week after it halted the scheduled blast-off due to a technical snag.
Chandrayaan-2 will be launched at 14:43 local time (09:13 GMT) on Monday, space agency Isro said.
It added the spacecraft was ready “to take a billion dreams to the Moon – now stronger than ever before”.
The space agency hopes the $150m (£120m) mission will be the first to land on the Moon’s south pole.
The countdown on 15 July was stopped 56 minutes before launch after a “technical snag was observed in [the] launch vehicle system”, according to Isro. Indian media have reported that a leak from a helium gas bottle in the cryogenic engine of the rocket was to blame.
Isro thanked people for supporting the mission despite the delay.
[alert color=”faebcc” icon=”fa-commenting”]Keeping up to date with breaking news while you are on the move is now simple with UTV Alerts [textmarker color=”8a6d3b”]Type REG UTV and send to 77000[/textmarker] on your Dialog, Airtel, or Hutch mobile connection[/alert]