NATIONAL

Sapugaskanda Refinery to close for 50 days

(UTV | COLOMBO) – Sri Lankan authorities have decided to temporarily shut down the Sapugaskanda oil refinery for a period of 50 days with effect from Monday (15).

Energy Minister Udaya Gammanpila told reporters that this decision was reached because it is paramount to manage the limited foreign reserves to import essential items to the country.

“The Sapugaskanda Oil Refinery is 51 years old and it produces 37% of Furnace Oil and Naptha. 19% is for Jet Fuel and Kerosene production. 43% for the production of Petrol and Diesel,” said the Minister.

He said due to the heavy rains experienced these days more than 50% of the electricity is generated via hydro plants, and the Ministry of Power had noted there is no requirement to use fuel for electricity production.

He also went on to note that Sri Lanka will provide Jet Fuel for long-distance flights, while short distance flights can obtain Jet Fuel from the airport of origin.

“Therefore, the foreign reserves will be used to import petrol, diesel, and other essential items,” he told reporters while adding that the refinery meets 17% of the total petrol requirement and 29% of the total diesel requirement.

Related posts

Reports of a hotel construction in Sinharaja, baseless

Staff Writer

Stop mudslinging: President tells SLFP-SLPP members

editor

Australia and Sri Lanka strengthen ties over aerial drone surveillance

Staff Writer