Uncategorized

President makes observation tour to Moragahakanda Project

(UTV|COLOMBO) – President Maithripala Sirisena has made an observation tour of the Moragahakanda Project, yesterday (22).

At present, the testing works of the Moragahakanda hydro-electricity plant, which will generate 25 Megawatt hydropower to the national grid, are being carried out successfully. During this observation tour the President inquired about in this regard.

The Moragahakanda hydro-electricity plant built within a shortest period of time in the history of the country.

The Plant was built near the Moragahakanda main dam and the electricity will be generated using four turbines. This will consist of two 7.5 Megawatt Turbines and another two 5 Megawatt Turbines.

The Moragahakanda reservoir is situated at 132 meter height from the sea level. When the water level of the reservoir increased to 165 meters from the sea level the power plant will be operated. When it reaches the highest level 185 meters the power will be generated.

The President who visited the project premises yesterday engaged in cordial discussion with the officials including the project engineers.

The Acting Director of the Moragahakanda-Kalu Ganga Multi-purpose Development Project Mr. T.B. Wijerathne participated on this occasion.

[alert color=”faebcc” icon=”fa-commenting”]Keeping up to date with breaking news while you are on the move is now simple with UTV Alerts [textmarker color=”8a6d3b”]Type REG UTV and send to 77000[/textmarker] on your Dialog or Hutch mobile connection[/alert]

 

Related posts

Police Department will be transformed as a profession of intellectuals – President

utvnewsenglish

University Non-Academic strike continues

Staff Writer

Be impartial at Local Government Elections – HRC warned public servants

Staff Writer